综合激情五月综合激情五月激情1,天天日天天干天天操,香蕉视频在线观看亚洲,亚洲色成人网站WWW永久

Bright Stone Information
About Us Executive Team Industry Layout News Investor Relations Join Us Contact us Corporate Culture
The high-end manned oxygen chamber creation project of Hongyuan Oxygen became the key cultivation pr
Author: Bright Stone Update time:2019-01-21 15:45:00 Clicks:879

Congratulations one the high-end manned oxygen chamber creation project of Hongyuan Oxygen of Hongyuan Oxygen (300 sets of manned pressure vessels per year) became the key cultivation project of Shandong Province in 2019.

 

 

 

In order to accelerate the transformation of new and old kinetic energy and achieve high-quality development. The core is the industry and the key is in the project. The reporter learned from the ventilation meeting held by the Provincial Development and Reform Commission on January 21 that in 2019, the province identified 120 provincial key projects, including 100 construction projects and 20 preparatory projects. The total investment of the project is 613 billion yuan. Among them, 100 construction projects have a total investment of 336 billion yuan, involving many projects such as Yantai High-speed Railway, Yantai Airport Phase II, and Haiyang Nuclear Power.

 

From the field of the project, 82 new-generation information technology and other emerging industry cultivation projects, with a total investment of 167 billion yuan; 24 high-end chemical industry and traditional industrial upgrading projects with a total investment of 87 billion yuan; 14 infrastructure projects with a total investment of 3590 100 million yuan.

 

There are two major innovations in the deployment of key provincial projects this year:

 

First, the project was released early. In order to ensure that the key projects in the province in 2019 were released early, implemented early, and effective, and advanced planning. The project was released two months ahead of schedule when the projects were launched in September last year. The important is grasped the golden period of spring civil that win the initiative to complete the year-round task.

 

The second is to establish a dynamic adjustment mechanism for key projects. The government has strengthened the tracking and effectiveness of the project, and it is unable to land the construction due to major changes in the investment subject, market demand, construction conditions, and it will not be a valid physical workload. In the middle of the year, it will be adjusted and withdrawn, and a batch of new construction projects that meet the requirements will be added.

 

From the perspective of the project, it fully reflects the requirements of the conversion of old and new kinetic energy, including the following four characteristics:

 

First, the proportion of physical industry projects is high. The government departments have increased the support for advanced manufacturing and technological innovation projects with long industrial chain, strong core competitiveness and outstanding radiation driving capabilities. The new generation of information technology, high-end equipment, high-end chemicals, new energy and new materials accounting for 66.7% of the total number of projects, an increase of 4.9 percentage points over the previous year.

 

The second is to support major planning and double-tapping projects. It is closely linked with major national plans and major activities in the province. Support national major planning projects such as Wanhua Ethylene and Longkou Nanshan LNG. Supported 33 qualified double-trick projects, of which 16 were contracted by the Confucian Merchants Conference.

 

The third is to highlight technological innovation. There are 64 projects in the world leading in process technology that broken foreign technology monopoly and filling domestic gaps, accounting for 80% of physical industry projects.

 

The fourth is to highlight effective investment. Strengthen the support of major infrastructure support and arrange 14 major infrastructure projects such as high-speed rail, expressway, airport and energy.

 

"In the next step, the government department will adhere to the problem orientation, make good use of engineering methods, pay more attention to service guarantees, pay more attention to landing results, and fully promote the accelerated construction of key projects to provide strong support for the province's economy to achieve high-quality development." Provincial Development and Reform Commission key project management Director Wang Xiaoyan introduced.

 

Strengthen coordination services. The government department will open up “green channels” for key projects, and effectively carry out various examination and approval services such as project establishment, planning and site selection, land use, environmental assessment, energy assessment, and construction permit. It can promote the project to start construction as soon as possible accelerate construction. Then, the government department will smooth communication channels between government and enterprises, coordinate and solve difficult problems. In order to achieve online operation, handheld operation and full cover of project promotion service, the department will utilize the informatization to optimize services and promote key projects on the cloud.

 

Crack the bottleneck. The government department deepened the cooperation mechanism between the government, the bank, the enterprise and strengthen the docking cooperation with the provincial new and old kinetic energy conversion funds and various financial institutions. In addition, the department will actively expand the financing channels, actively implement construction land use indicators  and solve the problem of demolition and relocation to ensure land supply.

 

Strengthen dispatch supervision. Strengthen the tracking and effectiveness and implement the exit and supplement of key provincial projects that including improve the monthly dispatching month analysis system, establish work schedules, implement inventory scheduling, and fully grasp the project construction. Intensify supervision and inspection, find problems and problems that constrain the construction of the project on the spot, research and propose targeted measures, and adopt slow notification and interviews to promote the degree of work and promotion.

 

It is also understood that in 2018, the provincial key projects will have an investment of 111.2 billion yuan, exceeding the annual plan by 9 percentage points. Among them, 61.8% of the projects belong to the new generation of information technology, high-end equipment and other advanced manufacturing industries, with high technology content and strong industry leading performance. After the whole project is put into production, it is estimated that the annual new sales income will be 255 billion yuan, profits and taxes will be 18.5 billion yuan, and employment will be 136,000 people. The construction of the Yantai Wanhua Ethylene Project marks a solid step for the province to build a world-class high-end petrochemical base. Rizhao Egret Bay Art Tour Town combines architectural art with leisure tourism. It receives 300,000 visitors a year and explores the realistic path for building a rural “Qilu Model”.

 

There are 48 projects that use technology and international and domestic leading, break the monopoly of foreign technology and fill the domestic gap. The project focuses on attracting talents and improving core competitiveness, and strengthening integrated innovation and collaborative innovation. The key technologies of Weifang Haomai's major marine engineering equipment have achieved major breakthroughs, and the products can be applied to deep sea oil and gas and combustible ice mining below 3000 meters. Qingdao International Academician Port has signed up to introduce 108 well-known academicians, including 92 foreign academicians, focusing on the frontier areas of biomedicine, new energy and new materials, and high-end equipment manufacturing.

 

The progress in the construction of major infrastructure projects has obviously accelerated. Jiqing High-speed Railway, as the first local high-speed railway invested and constructed, was opened to traffic in advance, achieving a 100-minute direct access to Jiqing, laying a solid foundation for the layout of the industry along the Jiaoji line. The Weifang-Shijiazhuang 1000 kV UHV transmission and transformation project has been accelerated to improve the safety and stability of the province's power grid.

 

Attachment: List of key construction projects in 2019 (Yantai project has been marked)

 

 

 

Source: Public Network